Culligan of the Piedmont

We partnered with a local contractor to provide this building for a water treatment facility in South Carolina. This steel building was buit on top of an 18″ stem wall and has a small pre-fabricated mezzanine system on the interior. This building also has an operable louver and electric fan for added ventilation.

Location: Union, SC
Size: 40x60x22

gray steel building with white trim, large openings, water treatment gray steel building with white trim, large openings, water treatment gray steel building with white trim, large openings, water treatment gray steel building with white trim, large openings, water treatment gray steel building with white trim, large openings, water treatment gray steel building with white trim, large openings, water treatment